Sandy City, UT Logo
File #: SUB-01-21-5984    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 2/10/2021 In control: Planning Commission
On agenda: 2/18/2021 Final action: 2/18/2021
Title: Pepperwood 11F Subdivision (Final Review) 11170 South Lone Hollow Road [Community #28 - Pepper Dell]
Attachments: 1. Staff Report (11F).pdf, 2. Plat - Pepperwood 11F (1-7-21).pdf, 3. Vicinity Map.pdf
Related files: SUB03162023-006503
Agenda Item Title:

Title

Pepperwood 11F Subdivision (Final Review)

11170 South Lone Hollow Road

[Community #28 - Pepper Dell]

Body

Presenter:

Mike Wilcox

Body

Description/Background:

Mr. David Bromley, on behalf of Ensign Properties, is requesting final planned unit development (PUD) and Sensitive Area Subdivision review of an additional phase of the Pepperwood area in compliance with the existing zoning of PUD(1.62). This phase will consist of five (5) single-family lots on 2.71 acres, which would be accessed from a new private street, Bent Hollow Lane. This property is located at approximately 11140 South Bentwood Lane (approx. 3000 East) (see map for boundaries).

See the attached detailed staff report for further information.

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine that final subdivision review and Sensitive Area Overlay Zone review is complete for the Pepperwood 11F Subdivision, located at approximately 11140 South Bentwood Lane (3000 East), and be subject to the following conditions:

1.                     That street improvements be carried out in accordance with plans and profiles stamped and approved by the Sandy City Engineering Department, and specifically:

                     a.                     That the private street system be improved to a 40-foot width, as established with other Pepperwood PUD development. This is to include a 32’ wide roadway with from curb to curb.

                     b.                     That road grades not exceed a maximum 12% slope per City Engineering specifications.

                     c.                     That appropriate measures be taken by the developer/builder to ensure minimal problems with mud tracking, blowing soil or sand during construction.

                     d.                     That any relocation of utilities required by City Ordinance be the responsibility of the developer.

   ...

Click here for full text