File #: SUB-07-18-5456    Version: 1 Name:
Type: Planning Item Status: Agenda Ready
File created: 12/11/2018 In control: Planning Commission
On agenda: 12/20/2018 Final action:
Title: ROW at 90th Subdivision (Prelim Review) 355 East 9000 South [Community #4 - Historic Sandy]
Attachments: 1. Staff Report.pdf, 2. Row at 90th 12-04-2018.pdf, 3. 2018-11-26_The Row at 90th_DD Set.pdf
Related files: ZONE-03-17-5225
Agenda Item Title:

Title

ROW at 90th Subdivision (Prelim Review)

355 East 9000 South

[Community #4 - Historic Sandy]

Body

Presenter:

Mike Wilcox

Body

Description/Background:

Mr. Rich Welch, of Garbett Homes, is requesting preliminary subdivision for a proposed for-sale ten (10) unit development of two (2) five-plex townhome buildings with rear-loaded alleys and fronting 9000 South street. The proposed units would be two stories and be approximately 1,600 - 1,800 sq. ft. in size.

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine that the Preliminary Subdivision review is complete for the ROW at 90th Subdivision, located at 355 East 9000 South, based on the following conditions:

1.                     That public street improvements be carried out in accordance with plans and profiles stamped and approved by staff, and specifically:

                     a.                     That 400 East be further dedicated and improved to a minimum half-width of twenty-nine feet (29’) and to include a five foot (5’) sidewalk, eight foot (8’) parkstrip, and curb & gutter (2.5’).

                     b.                     That appropriate measures be taken by the developer/builder to insure minimal problems with mud tracking and blowing soil/sand during construction.

                     c.                     That any relocation of utilities required by City Ordinance be the responsibility of the developer.

                     d.                     That a permit be obtained from the Salt Lake County Surveyor’s Office prior to installation of survey monuments.  All survey monuments installed shall be in accordance with the approved permit.

2.                     That the applicant complies with each department’s comments and redlines throughout the final review process and that all issues be resolved before the subdivision can be recorded.

3.                     That...