Skip to main content
Sandy City, UT Logo
File #: SPR04142025-006949    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 7/29/2025 In control: Planning Commission
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Jordan Credit Union Branch Office 9260 S. 300 E. St. [Community # 4, Historic Sandy]
Attachments: 1. Staff Report, 2. Exhibit A, 3. Exhibit B, 4. Exhibit C
Related files: CUP05012025-006961, SUB04142025-006950
Agenda Item Title:

Title

Jordan Credit Union Branch Office

9260 S. 300 E. St.

[Community # 4, Historic Sandy]

Body

Presenter:

Douglas L. Wheelwright, Development Services Manager

Body

Description/Background:

The applicant, Nate Reimer, P.E with CIR Engineering, representing Eileen Eckman, owner’s representative for Jordan Credit Union, is requesting review of a preliminary commercial modified site plan review, for a property located at 9260 S. 300 E. The site plan review will consider exterior building design, materials changes, reconfigure the existing parking lot and driveways, a new detached building for drive-up window service, and provide new site landscaping. The new site configuration will increase the drive-up teller queuing space capacity but decrease the available on-site vehicle parking. A 20 percent reduction in the required off-street parking is requested. Please see the attached Exhibits for details on the application materials.

See the attached staff report and exhibits for full details of the request.

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine preliminary site plan review is complete for the proposed Jordan Credit Union Branch Office located at 9260 S. 300 E. based on the following findings and subject to the following conditions:

Findings:

1.                     That the proposed project will meet all the applicable requirements of the Sandy City Development Code and the Sandy City Architectural Design Standards as to building architectural design, materials and colors.

2.                     That the proposed remodeled building and new site improvements to this existing financial service building and use will improve the viability of this existing credit union branch office, by improving the functionality and the visual appearance of the building and the existing site.

3.                     That the requested parking reduction is j...

Click here for full text