File #: SPR-03-18-5373    Version: 1 Name:
Type: Planning Item Status: Passed
File created: 4/17/2018 In control: Planning Commission
On agenda: 5/3/2018 Final action: 5/3/2018
Title: iFly Indoor Skydiving 154 W. 11400 S. State Street South Towne, Community #9
Attachments: 1. FINAL Staff Report, 2. Exhibits-4-27-18.docx
Related files: SPR-10-18-5551
Agenda Item Title:
Title
iFly Indoor Skydiving
154 W. 11400 S. State Street
South Towne, Community #9

Body
Presenter:
Doug Wheelwright

Body
Description/Background:
Mr. Stephen Selu, P.E., Kimley-Horn Consulting Engineers, and Mr. Lou Gambertoglio, representing Skygroup Investments, LLC, are proposing the construction of an iFly indoor skydiving operation, located on an existing, vacant pad site lot at the One-14 Retail Center, just south of the Scheels store. This project will complete the One-14 Retail Center project. Indoor recreation is a permitted use in the CBD zoning district. All of the surrounding property within Sandy City limits is zoned Central Business District (CBD). A community meeting was not held for this project, because it is a permitted use, and there are no residential uses nearby. The CBD zoning district requires that the Planning Commission approve the building architectural design, materials and colors, after review by the Civic Center Architectural Design Review Committee.



Recommended Action and/or Suggested Motion:
Recommendation
Staff recommends that the Planning Commission approve the preliminary site plan for the proposed iFly Indoor Skydiving facility and approve the building architectural design, building materials and colors as proposed, based on the staff report, and the two findings listed below and subject to the following seven conditions:

FINDINGS:

A. That the various City Departments and Divisions, including the City Engineer and the Transportation Engineer, have preliminarily approved the proposed site plan.

B. That the proposed building design, materials and colors meet the Sandy City Architectural Design Requirements, and have been favorably recommended by the Civic Center Architectural Design Review Committee.

CONDITIONS:

1. That the developer proceed through the final site plan review process with staff prior to the start of any construction (including payment of development fees and posting of an appr...

Click here for full text