Skip to main content
Sandy City, UT Logo
File #: SPR03132025-006926    Version: 1 Name:
Type: Planning Item Status: Agenda Ready
File created: 1/6/2026 In control: Planning Commission
On agenda: 1/15/2026 Final action:
Title: Architectural Components HQ Site Plan (Site Plan Review) 9352 S 670 W [Community 2, Civic Center
Attachments: 1. Staff Report, 2. Exhibit A, 3. Exhibit C
Date Ver.Action ByActionResultAction DetailsMeeting DetailsMedia
No records to display.
Agenda Item Title:

Title

Architectural Components HQ Site Plan (Site Plan Review)

9352 S 670 W

[Community 2, Civic Center

Body

Presenter:

Thomas Irvin, Senior Planner

Body

Description/Background:

The applicant, Josh Naylor with Architectural Components, is requesting review of a preliminary site plan for the property located at 9352 S. 670 W. The site plan review will consider the new building design, materials, parking lot, driveways, loading dock, and landscaping. The applicant is also seeking a reduction in the number of required parking stalls.

Please see the attached staff report and exhibits for full details of the application.

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine preliminary site plan review is complete for the proposed Architectural Components Headquarters located at 9352 S. 670 W., based on the following findings and subject to the following conditions:

Findings:

1.                     That the proposed project will meet all the applicable requirements of the Sandy City Development Code and the Sandy City Architectural Design Standards as to building architectural design, materials and colors.

2.                     That the proposed new building and site improvements to the property will improve the visual appearance of the streetscape and fit in with the surrounding developed properties.

3.                     That the requested parking reduction is justified under the provision of the Sandy City Development Code.

Conditions:

1.                     That the developer proceeds through the final site plan review process with staff prior to the start of any construction. The final site plan shall comply with all Development Code requirements and those modifications required or allowed by the Planning Commission.

2.                     That the existing walls located at proposed cross access locations along the north and south side...

Click here for full text