Sandy City, UT Logo
File #: SPR-09-18-5482    Version: 1 Name:
Type: Planning Item Status: Agenda Ready
File created: 10/9/2018 In control: Planning Commission
On agenda: 10/18/2018 Final action:
Title: Stor-N-Lock Storage Builidng 8594 S. Harrison Street [Northwest Exposure, Community # 1]
Attachments: 1. PC Report, 2. Exhibits.pdf, 3. Notice Map.pdf
Related files: SUB-09-18-5483

Agenda Item Title:

Title

Stor-N-Lock Storage Builidng

8594 S. Harrison Street

[Northwest Exposure, Community # 1]

 

 

Body

Presenter:

Douglas L. Wheelwright

Body

Description/Background:

The applicant is requesting that the Planning Commission review and approve a site plan for the addition of a two-story, climate controlled, commercial storage building to the existing mini-storage building complex. The Planning Commission is the land use approval body for this action, as designated in the Sandy City Development Code, and must also determine the amount of required customer parking for the storage building addition.

 

BACKGROUND 

This site is vacant, but once had a house on it.  It is surrounded on three sides by the existing mini-storage complex, which occupies approximately 4 acres.  The subject property is located at 8594 S. Harrison Street, and is zoned Regional Commercial, (RC).  Midvale City jurisdiction property is located to the east of Harrison Street and northward.  All of the Sandy City jurisdiction property is zoned RC and is developed with non-residential land uses.  The proposal is to build a two-story, climate controlled storage building and integrate this storage use with the existing mini-storage business.  Each level of the new building will contain 21,000 square feet of storage space, consisting of both overhead door access units around the perimeter of the building and internal storage closets, accessible from inside the building.

 

 

 

 

Further action to be taken:

 

 

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine that preliminary site plan review is complete, and that no new customer parking is necessary in this application, based on this staff report, and the two findings listed below and subject to the following nine conditions:

 

FINDINGS:

 

A.                     That the various City Departments and Divisions, including the City Engineer and the Transportation Engineer, have preliminarily approved the proposed site plan.

 

B.                     That in this case, no additional customer parking is necessary for the new building, due to the integration of the new building into the existing mini-storage complex, which currently has the necessary customer support facilities on the larger site.

 

 

 

 

CONDITIONS:

 

1.                     That the developer proceed through the final site plan review process with staff prior to the start of any construction (including payment of development fees and posting of an appropriate bond to guarantee completion of all required improvements on and off the site), according to the Site Plan Review Procedures Handout.  The final site plan shall be in compliance with all Development Code requirements and those modifications required by the Planning Commission.

 

2.                     That the utility service infrastructure be coordinated with City staff and the applicant to insure compliance with fire code and building code requirements for this use before final building occupancy.

 

3.                     That the development comply with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.

 

4.                     All utility boxes shall be screened from view to the extent possible (i.e. transformers, switch gear, telephone, cable TV, etc.) and shall be shown on the site plan and shall be placed underground or moved behind the front setback (minimum of 30 feet from the front property line) and screened from view.  Each box shall be shown in its exact location and shall be noted with its exact height, width and length and approved by staff.

 

5.                     That the architectural design, colors and materials proposed for this development comply with the Sandy City Architectural Design Standards and shall be finalized with staff prior to the issuance of a building permit.

 

6.                     That the developer be responsible for the placement of a temporary 6 foot high chain link fence around the perimeter of the project during the construction phase of the project for security.  Said fence shall also be required to include fabric to prohibit blowing dust problems, if it becomes necessary or if it is required by the Community Development Department during Site Plan Review.

 

7.                     That the applicant comply with the Sandy City Noise Ordinance, including working hours during construction.

 

8.                     That the applicant comply with all department requirements as noted in all Preliminary Review letters prior to submittal for final site plan review.

 

9.                     That all building and site signage must be reviewed separately and meet the Sandy City Development Code provisions for signage with a unified and coordinated signage design, as determined by City staff.