Description/Background:
The applicant, Nate Reimer, P.E with CIR Engineering, representing Eileen Eckman, owner’s representative for Jordan Credit Union, is requesting review of a preliminary commercial modified site plan review, for a property located at 9260 S. 300 E. The site plan review will consider exterior building design, materials changes, reconfigure the existing parking lot and driveways, a new detached building for drive-up window service, and provide new site landscaping. The new site configuration will increase the drive-up teller queuing space capacity but decrease the available on-site vehicle parking. A 20 percent reduction in the required off-street parking is requested. Please see the attached Exhibits for details on the application materials.
See the attached staff report and exhibits for full details of the request.
Recommended Action and/or Suggested Motion:
Recommendation
Staff recommends that the Planning Commission determine preliminary site plan review is complete for the proposed Jordan Credit Union Branch Office located at 9260 S. 300 E. based on the following findings and subject to the following conditions:
Findings:
1. That the proposed project will meet all the applicable requirements of the Sandy City Development Code and the Sandy City Architectural Design Standards as to building architectural design, materials and colors.
2. That the proposed remodeled building and new site improvements to this existing financial service building and use will improve the viability of this existing credit union branch office, by improving the functionality and the visual appearance of the building and the existing site.
3. That the requested parking reduction is justified under the provision of the Sandy City Development Code.
4. That the new building design, material and colors will better contribute to the creation of a “Campus” feeling for the Canyons District facilities with the new middle school design and the district offices, located along 300 E. St.
Conditions:
1. That street improvements be carried out according to the Sandy City Engineer and specifically:
a. That 300 East Street be further improved to a 32 foot half-width public right-of-way following the standard improvements found in the Standard Details and Specifications.
2. That a 20 percent reduction in the required amount of off-street vehicle parking is approved.
3. That the proposed building design, materials and colors is approved as presented in the application materials.
4. That the developer proceeds through the final site plan review process with staff prior to the start of any construction. The final site plan shall comply with all Development Code requirements and those modifications required or allowed by the Planning Commission.
5. That the development complies with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.
6. All utility boxes (i.e. transformers, switchgear, telephone, cable TV, etc.) shall be shown on the site plan and shall be placed underground or moved behind the front setback of the buildings and screened from view. Each box shall be shown in its exact location and shall be noted with its exact height, width and length. Building utility meters shall be mounted to the side or rear elevation or screened.
7. That the developer be responsible for the placement of a temporary 6-foot-high chain link fence around the perimeter of the project during the construction phase of the project for security. Said fence shall also be required to include fabric to prohibit blowing dust problems, if it becomes necessary or if it is required by the Community Development Department during Site Plan Review.
8. That the applicant complies with all department requirements as noted in all Preliminary Review letters or communications prior to submittal for final site plan review with staff.