Title: Cyprus Credit Union Site Plan Review 8955 S. 700 East Street [Quarry Bend, Community, #7]
Attachments: 1. Final Cyprus Credit Union Site Plan Review P.C. staff report 11-03-2022

Agenda Item Title:

Title

Cyprus Credit Union Site Plan Review                    

8955 S. 700 East Street                    

[Quarry Bend, Community, #7]                    

 

Body

Presenter:

Douglas L. Wheelwright

 

Body

Description/Background:

The applicants, Buddy Bennett, representing Cyprus Credit Union, and architect Michelle MacDonnell, representing Galloway Consultants, are requesting Site Plan Review for the property located at 8955 S. 700 East Street to be redeveloped as a new bank branch office for Cyprus Credit Union. A financial institution is a permitted use in the Boulevard Commercial (BC) zoning district; however, a bank drive-up window requires a Conditional Use Permit. This project also includes a two-lot commercial subdivision, which will be addressed in a companion staff report on this Planning Commission agenda.

 

Please see the attached staff report for full details.

 

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine that Preliminary Site Plan Review is complete for the Cyprus Credit Union Sandy Branch office, located at 8955 S. 700 East Street, based on the following findings and subject to the following conditions:

 

Findings:

 

1.                     All reviewing City Departments and Division have reviewed the plans and recommend Planning Commission Approval, subject to their requirements and corrections to the plans.

 

2.                     This location has always been occupied by a bank branch land-use with drive-up teller service.

 

3.                     Abutting street infrastructure has previously been widened and expanded, eliminating the street scape landscaping, which will now be replaced with the new site redevelopment.

 

Conditions:

1.                     That the developer proceeds through the final site plan review process with staff prior to the start of any construction. The final site plan shall comply with all Development Code requirements and those modifications required or allowed by the Planning Commission.

 

2.                     That the development complies with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.

 

3.                     All utility boxes (i.e., transformers, switchgear, telephone, cable TV, etc.) shall be shown on the site plan and shall be placed underground or moved behind the front setback of the buildings and screened from view. Each box shall be shown in its exact location and shall be noted with its exact height, width, and length. Building utility meters shall be mounted to the side or rear elevation or screened.

 

4.                     That the developer be responsible for the placement of a temporary six foot (6’) tall chain link fence around the perimeter of the project during the construction phase of the project for security. Said fence shall also be required to include fabric to prohibit blowing dust problems if it becomes necessary or if it is required by the Community Development Department during Site Plan Review.

 

5.                     That the applicant complies with all department requirements as noted in all Preliminary Review letters prior to submittal for final site plan review with staff.

 

6.                     That all signage be reviewed and approved under separate permit and be in conformance with City Code.