Title: Sandy Amphitheater Expansion (Modified Site Plan Review) 1245 E. 9400 S. [Quarry Bend, Community #7]
Attachments: 1. Staff Report, 2. PC Submittal Set

Agenda Item Title:

Title

Sandy Amphitheater Expansion (Modified Site Plan Review)

1245 E. 9400 S.

[Quarry Bend, Community #7]

 

Body

Presenter:

Mike Wilcox

 

Body

Description/Background:

The applicant, Mearle Marsh, Community Arts Director for Sandy City, is requesting preliminary site plan review of a proposed expansion of the existing Sandy Amphitheater located at 1245 E. 9400 S. The request is to expand the eastern plaza to provide one additional concession building and gathering spaces. It would also add a merchandise pavilion on the west side and a lawn chair pavilion on the south side. The east parking lot will be modified to add landscaping following waterwise and low impact development standards to help with storm water management. The glass recycling bin will also be placed in an encloser on the east side of the Sandy City Senior Center. See the attached Exhibit A for all application materials and the attached staff report for full details of the request.

 

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission Planning Commission determine preliminary review is complete for the Sandy Amphitheater Expansion located at 1245 E. 9400 S. based on the following findings and subject to the following conditions:

 

Findings:

1.                     That the proposed project meets or will meet all the applicable requirements of the Sandy City Development Code and the Sandy City Architectural Design Standards as to building architectural design, materials, and colors.

 

2.                     That proposed building addition will enhance the functionality of the Amphitheater.

 

Conditions

1.                     That the development will comply with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.

 

2.                     That the developer be responsible to meet all provisions of the SD(MU) zoning district and the Sandy City Architectural Design Requirements with the details finalized with staff during Final Site Plan review.

 

3.                     That the requirements and conditions of the various City Departments and Divisions be met and finalized during the Final Site Plan Review process with staff.

 

4.                     That the applicant work with staff to revise the gate design of the recycling enclosure.