Skip to main content
Sandy City, UT Logo
File #: SPR08072025-007014    Version: 1 Name:
Type: Planning Item Status: Agenda Ready
File created: 11/18/2025 In control: Planning Commission
On agenda: 12/4/2025 Final action:
Title: Middle Mile Infrastructure Site Plan Review 10935 S. 700 E. St. [Community #12]
Attachments: 1. Final Staff Report, 2. Applicant letter, 3. Site Plan Package
Related files: CUP08052025-007012

Agenda Item Title:

Middle Mile Infrastructure Site Plan Review

10935 S. 700 E. St.

[Community #12]

 

Body

Presenter:

Douglas L. Wheelwright, Development Services Manager

 

Body

Description/Background:

The applicants, Christina Lewis of AE-COM is representing Middle Mile Infrastructure, and Scott Bunnell of Navigate Private Wealth, LLC (owner of the property), are requesting preliminary commercial site plan review and a conditional use permit for a public utility station for a fiber optic booster station on the property located at 10935 S. 700 E. The site is proposed as a public utility station installation for fiber optic infrastructure support, through a conditional use permit in the SD (PO-Silver Sage) zoning district.

 

Please see the attached staff report and exhibits for full details and analysis of this request.

 

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission approve the proposed Middle Mile Infrastructure preliminary site plan review, located at10935 S. 700 E., as described in this staff report and based on the following findings and subject to the following conditions:

 

Findings:

1.                     Approval of this site plan will help put this vacant site to valuable use at this location and complete the development along 700 E. St.

 

2.                     The site plan meets or will meet all applicable city ordinances and requirement for site plan review in this SD zoning district.

 

3.                     This booster utility is needed as various telecommunications systems continue to increase in speed and customers.

 

Conditions:

1.                     That the development will comply with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.

 

2.                     That the developer proceeds through the final site plan review process with staff. The final site plan shall be in compliance with all Development Code requirements, staff red lines, and those modifications as accepted by the Planning Commission.

 

3.                     That the developer be responsible to meet all provisions of the SD (PO-Silver Sage) zoning district.

 

4.                     That the requirements and conditions of the various city departments and divisions be met and details finalized during the final site plan review process with staff.

 

5.                     That all future signage be reviewed and approved under a separate permit application and the existing or amended sign theme approval for the project area and be in conformance with city code.