Agenda Item Title:

Rees Capital Office Site Plan (Preliminary Review)

1680 E. Dimple Dell Road

[Community 22]

 

Presenter:

Douglas L. Wheelwright

 

Description/Background:

Mr. Rollin Anderson and Ms. Amy Rees Anderson, DBA as Rees Capital, representing IPOA, LLC, property owner, are requesting the Planning Commission to determine that preliminary Site Plan Review for a new professional office building is complete. The Planning Commission is the land use approval body for this action, as designated in the Sandy City Development Code.

The property is located 1680 E. Dimple Dell Road. The office is proposed to be one story in height above grade and contain approximately 3,217 square feet of office space, and an attached garage of 1,112 square feet for the owner's personal passenger vehicles. The property parcel is vacant and contains 23,016 square feet of land area and is located on the southwest corner of 1700 East and Dimple Dell Road (approximately 10700 South) at 1680 East Dimple Dell Road. The property was recently re-zoned by the Sandy City Council from Residential to Professional Office (PO) at the request of the owners, and in anticipation of this project.

 

 

 

Recommended Action and/or Suggested Motion:

Recommendation

Staff recommends that the Planning Commission determine that preliminary site plan review for Rees Capital Office is complete and that the building architectural design, materials and colors are approved, based on the staff report, and the two findings listed below and subject to the following ten conditions:

 

FINDINGS:

 

A.                     That the various City Departments and Divisions, including the City Engineer and the Transportation Engineer, have preliminarily approved the proposed site plan.

 

B.                     That the proposed building’s design, materials and colors meet the Sandy City Architectural Design Requirements, if Terro Neo type Stucco/EIFS is used where this material exceeds the 20 percent maximum per each building face limit.

 

CONDITIONS:

 

1.                     That the developer proceeds through the final site plan review process with staff prior to the start of any construction (including payment of development fees and posting of an appropriate bond to guarantee completion of all required improvements on and off the site), according to the Site Plan Review Procedures Handout.  The final site plan shall be in compliance with all Development Code requirements and those modifications required/allowed by the Planning Commission.

 

2.                     That the use of the attached garage be strictly limited to the daily parking by the occupants of the office building for their personal transportation vehicles, and not for any storage of recreational vehicles, boats, ATV’s, etc.

 

3.                     That required street trees be installed along Dimple Dell Road in the 63 foot area outside the required clear sight triangles with either three trees spaced evenly along that street frontage or six trees, planted in an informal clumping design approved by planning staff.  That 2 street trees be installed along the 1700 East Street frontage.

 

4.                     That the developer be required to install the required 8 foot high masonry buffer wall along the south and west property boundary, constructed entirely upon the applicant’s property, to provide the necessary buffering of light, noise and commotion from the office use of the property adjacent the residentially developed property.

 

5.                     That the development complies with all Building & Safety, Fire and Life Safety Codes applicable to this type of use.

 

6.                     All utility boxes (i.e. transformers, switch gear, telephone, cable TV, etc.) shall be shown on the final site plan and shall be placed underground or moved behind the front setback (minimum of 30 feet from the front property line) and screened from view.  Each box shall be shown in its exact location and shall be noted with its exact height, width and length and approved by staff.

 

7.                     That the architectural design, colors and materials proposed for this development and as approved by the Planning Commission as complying with the Sandy City Architectural Design Standards be finalized with staff prior to the issuance of a building permit, including the use of Terro Neo type stucco/EIFS in excess of 20 percent per building face, a shown on the architectural elevations of the building.

 

8.                     That the developer be responsible for the placement of a temporary 6 foot high chain link fence around the perimeter of the project during the construction phase of the project for security.  Said fence shall also be required to include fabric to prohibit blowing dust problems, if it becomes necessary or if it is required by the Community Development Department during Site Plan Review.

 

9.                     That the applicant complies with the Sandy City Noise Ordinance, including working hours during construction.

 

10.                     That the applicant complies with all department requirements as noted in all Preliminary Review letters prior to submittal for final site plan review.